MariBell Transmission Project

Dairyland Power Cooperative and GridLiance Heartland are planning a 140-mile, double-circuit transmission line between Marion, Minnesota, and Bell Center, Wisconsin. The proposed project includes both a new 765 kilovolt (kV) transmission line and a rebuilt 161 kV line located within the existing transmission corridor